<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.1d1 20130915//EN" "http://jats.nlm.nih.gov/publishing/1.1d1/JATS-journalpublishing1.dtd">
<article xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" article-type="review-article" xml:lang="en">
<front>
<journal-meta>
<journal-id journal-id-type="publisher-id">JOLGRI</journal-id>
<journal-title-group>
<journal-title>Journal of Local Government Research and Innovation</journal-title>
</journal-title-group>
<issn pub-type="ppub">2709-7412</issn>
<issn pub-type="epub">2788-919X</issn>
<publisher>
<publisher-name>AOSIS</publisher-name>
</publisher>
</journal-meta>
<article-meta>
<article-id pub-id-type="publisher-id">JOLGRI-7-338</article-id>
<article-id pub-id-type="doi">10.4102/jolgri.v7i0.338</article-id>
<article-categories>
<subj-group subj-group-type="heading">
<subject>Review Article</subject>
</subj-group>
</article-categories>
<title-group>
<article-title>Exploring factors leading to the abandonment of public infrastructure projects in selected local municipalities in Limpopo province</article-title>
</title-group>
<contrib-group>
<contrib contrib-type="author" corresp="yes">
<contrib-id contrib-id-type="orcid">https://orcid.org/0000-0002-2851-3591</contrib-id>
<name>
<surname>Mabeba</surname>
<given-names>Selaelo J.</given-names>
</name>
<xref ref-type="aff" rid="AF0001">1</xref>
<xref ref-type="aff" rid="AF0002">2</xref>
</contrib>
<contrib contrib-type="author">
<contrib-id contrib-id-type="orcid">https://orcid.org/0000-0002-2136-6787</contrib-id>
<name>
<surname>Lukamba</surname>
<given-names>Muhiya T.</given-names>
</name>
<xref ref-type="aff" rid="AF0002">2</xref>
</contrib>
<contrib contrib-type="author">
<contrib-id contrib-id-type="orcid">https://orcid.org/0000-0001-6937-5933</contrib-id>
<name>
<surname>Molokwane</surname>
<given-names>Thekiso</given-names>
</name>
<xref ref-type="aff" rid="AF0003">3</xref>
</contrib>
<aff id="AF0001"><label>1</label>Department of Public Administration, Faculty of Management and Law, University of Limpopo, Polokwane, South Africa</aff>
<aff id="AF0002"><label>2</label>School of Government Studies, Faculty of Humanities, North-West University, Vanderbijlpark, South Africa</aff>
<aff id="AF0003"><label>3</label>School of Commerce, University of KwaZulu-Natal, Durban, South Africa</aff>
</contrib-group>
<author-notes>
<corresp id="cor1"><bold>Corresponding author:</bold> Selaelo Mabeba, <email xlink:href="selaelojohnmabeba@gmail.com">selaelojohnmabeba@gmail.com</email></corresp>
</author-notes>
<pub-date pub-type="epub"><day>12</day><month>08</month><year>2026</year></pub-date>
<pub-date pub-type="collection"><year>2026</year></pub-date>
<volume>7</volume>
<elocation-id>338</elocation-id>
<history>
<date date-type="received"><day>09</day><month>12</month><year>2025</year></date>
<date date-type="accepted"><day>15</day><month>04</month><year>2026</year></date>
</history>
<permissions>
<copyright-statement>&#x00A9; 2026. The Authors</copyright-statement>
<copyright-year>2026</copyright-year>
<license license-type="open-access" xlink:href="https://creativecommons.org/licenses/by/4.0/">
<license-p>Licensee: AOSIS. This work is licensed under the Creative Commons Attribution 4.0 International (CC BY 4.0) license.</license-p>
</license>
</permissions>
<abstract>
<sec id="st1">
<title>Background</title>
<p>The abandonment of public infrastructure projects in South Africa&#x2019;s municipalities is attributed to several factors. These include contractors running out of money and requesting release in the middle of the implementation of public infrastructure projects, community protests, late payments by municipalities and underestimation of project costs by contractors.</p>
</sec>
<sec id="st2">
<title>Aim</title>
<p>To analyse the causes of abandoning the implementation of public infrastructure projects.</p>
</sec>
<sec id="st3">
<title>Method</title>
<p>Through the application of a qualitative research design, the study selected three local municipalities under the Capricorn District in Limpopo province to draw insights. Semi-structured interviews were conducted in which 16 municipal officials were interviewed. This study employed an interpretative research paradigm.</p>
</sec>
<sec id="st4">
<title>Results</title>
<p>The study&#x2019;s findings reveal factors such as community protests, payment delays to service providers, weather conditions, termination of service providers, difficulties obtaining construction permits during the construction of these projects and political interference over appointments and labourers. Lastly, various political parties engaging in subcontracting, disputes, and interference led to the abandonment of public infrastructure projects.</p>
</sec>
<sec id="st5">
<title>Conclusion</title>
<p>The findings could assist local government practitioners and policymakers to develop effective strategies that can minimise the abandonment of government projects.</p>
</sec>
<sec id="st6">
<title>Contribution</title>
<p>This study contributes to the sphere of local government by outlining the factors that led to the abandonment of public infrastructure projects in three selected local municipalities in Limpopo province.</p>
</sec>
</abstract>
<kwd-group>
<kwd>public infrastructure projects</kwd>
<kwd>municipalities</kwd>
<kwd>abandoning</kwd>
<kwd>service providers</kwd>
<kwd>political parties</kwd>
<kwd>community members</kwd>
</kwd-group>
<funding-group>
<funding-statement><bold>Funding information</bold> This research received no specific grant from any funding agency in the public, commercial or not-for-profit sectors.</funding-statement>
</funding-group>
</article-meta>
</front>
<body>
<sec id="s0001">
<title>Introduction</title>
<p>The primary purpose of local government is to provide services such as water, sport, sanitation, power, and road infrastructure to the local community to address their needs (Nel &#x0026; Minnie <xref ref-type="bibr" rid="CIT0033">2022</xref>). Asha and Makalela (<xref ref-type="bibr" rid="CIT0006">2020</xref>) also emphasised that it is the responsibility of local government to provide effective delivery of basic infrastructure and services. Integrated Development Plan (IDP) has been employed by South African local governments to enhance essential services such as road, water and sport infrastructure that are under their jurisdiction. The provision of water and road infrastructure services is a prerequisite for nations and governments worldwide to accomplish the targets of the Sustainable Development Goals (SDGs). Achieving the SDGs requires infrastructure development (The Economics Intelligence Unit <xref ref-type="bibr" rid="CIT0042">2019</xref>). Academics and legislators alike concur that public infrastructure is essential to economies&#x2019; ability to function. Investment in infrastructure is thought to be a crucial factor in promoting economic expansion, elevating employment rates, and decreasing levels of inequality. Research indicates that infrastructure investment can increase both short-term demand and long-term production (Msimango, Orffer &#x0026; Van Reenen <xref ref-type="bibr" rid="CIT0031">2024</xref>). Infrastructure development is a primary determinant of socio-economic development, or the growth of an economy (Bhattacharya, Oppenheim &#x0026; Stern <xref ref-type="bibr" rid="CIT0008">2015</xref>; Programme for Infrastructure Development in Africa <xref ref-type="bibr" rid="CIT0034">2010</xref>; Srinivasu &#x0026; Rao <xref ref-type="bibr" rid="CIT0041">2013</xref>).</p>
<p>Not all economic studies employ the same concept of infrastructure (Torrisi <xref ref-type="bibr" rid="CIT0043">2009</xref>). According to Dobbs et al. (<xref ref-type="bibr" rid="CIT0012">2013</xref>), infrastructure is the framework or essential foundation that upholds the advancement of a community, underscoring the infrastructure&#x2019;s crucial role in socio-economic development. Despite the preceding discussion, there are various causes of abandoning the implementation of road, water and sport infrastructure projects. There are three kinds of elements that affect the delivery of public infrastructure: Typically bureaucratic, organisational, and technical. The bureaucratic factors identified by Jacobs et al. (<xref ref-type="bibr" rid="CIT0024">2021</xref>) include corruption, maladministration, a lack of good governance, and delivery management practices.</p>
<p>The organisational factors include a lack of management capacity, external funding, monitoring and checking processes, payment delays to service providers, and poor procurement practices. The technical factors include identification, assessment, and preparation errors, a lack of employee training programmes, frequent changes in project teams, and lengthy infrastructure project administration procedures. This study explores the causes of abandoning public infrastructure projects, providing empirical evidence from road, water and sport infrastructure projects in Molemole, Blouberg and Polokwane Local Municipalities located in the Capricorn District of Limpopo Province. One of the fundamentals of scientific research is to identify a research gap. The study contributes by outlining environmental, internal, external factors and contractor-related causes that led to the abandonment of public infrastructure projects in the three selected local municipalities in Limpopo province. In addition, there is limited empirical evidence about the topic under inquiry, especially in the chosen local municipalities. Furthermore, the study presents a comparative municipal analysis of causes leading to the abandonment of road, water and sport infrastructure projects in each of the three local municipalities. The study used a cross-case comparative analysis approach, analysing each municipality separately before carrying out structured comparisons across cases. Therefore, it is worth noting that there is empirical evidence on the same topic, but from studies that were conducted with local municipalities in other provinces.</p>
</sec>
<sec id="s0002">
<title>Reasons for abandoning municipal infrastructure projects</title>
<p>Among other factors, corruption, construction mafias, internal and external factors, poor planning and feasibility studies, contractors and change of political leadership and policy inconsistencies were identified as the reasons for abandoning government projects.</p>
<sec id="s20003">
<title>Corruption</title>
<p>According to Hollands (<xref ref-type="bibr" rid="CIT0019">2019</xref>), corruption is a complex factor that contributes to both resource shortages and slow implementation of public infrastructure development plans. The Auditor General&#x2019;s reports have identified corruption as a factor in the problems the infrastructure delivery portfolios in the province are facing (Hollands <xref ref-type="bibr" rid="CIT0019">2019</xref>). In addition, the misallocation of resources and ineffective financial management were identified as key factors contributing to the exhaustion of project budgets, ultimately hindering the continued implementation of public infrastructure initiatives (Ibrahim <xref ref-type="bibr" rid="CIT0020">2025</xref>).</p>
</sec>
<sec id="s20004">
<title>Construction mafias</title>
<p>The growth of organised crime is facilitated by the state&#x2019;s diminished capabilities and the inefficiencies in the law enforcement community. A lack of accountability within law enforcement agencies is a result of weak governance frameworks, including oversight procedures. Criminal networks deliberately target building sites for financial gain, taking advantage of this weakness in law enforcement and responsibility. There have been serious economic consequences as a result of this trend spreading across the nation (Global Initiative Against Transnational Organised Crime <xref ref-type="bibr" rid="CIT0018">2022</xref>). According to the Global Initiative Against Transnational Organised Crime (<xref ref-type="bibr" rid="CIT0018">2022</xref>), organised crime has become an existential threat to South Africa&#x2019;s democratic systems. In a September 2022 report, it makes the case that in order to secure a more stable future for South Africa, organised crime must be addressed with greater strategic vigour. Organised crime and the illegal marketplaces are likely to persist if left unchecked. For example, construction mafias go further by registering firms in gang-ridden areas such as Cape Town, in the Western Cape. If their demands for a 30&#x0025; stake remain unfulfilled, they threaten construction projects with mafia techniques (Inclusive Society Institute <xref ref-type="bibr" rid="CIT0022">2023</xref>).</p>
<p>In a 2019 appeal to the late and then Finance Minister Tito Mboweni, the South African Forum of Civil Engineering Contractors emphasised the need for immediate government action against the construction mafia, pointing out that 110 engineers and other highly qualified technical personnel had either fled the country or were about to do so because of personal risk to their lives and a lack of work as a result of projects being interrupted at gunpoint (Mfebe <xref ref-type="bibr" rid="CIT0028">2019</xref>). In certain situations, expediting project delivery may unintentionally raise the infrastructure project&#x2019;s costs. Measures must still be taken to guarantee that the project is finished on schedule (Alinaitwe, Apolot &#x0026; Tiniwensi <xref ref-type="bibr" rid="CIT0004">2013</xref>).</p>
</sec>
<sec id="s20005">
<title>Internal and external factors</title>
<p>Infrastructure project delays can also be caused by changes in the public sector&#x2019;s ranked scope, municipal payment delays, inadequate monitoring, labour, political, and capital costs (Alinaitwe et al. <xref ref-type="bibr" rid="CIT0004">2013</xref>). Typically, implementation process flaws cause the majority of construction projects to fall short of their goals, ultimately resulting in discontent among contractors and clients (Ika <xref ref-type="bibr" rid="CIT0021">2012</xref>). These projects often face many obstacles to completion, including delays and cost overruns (Aibinu &#x0026; Jagboro <xref ref-type="bibr" rid="CIT0003">2002</xref>; Ika <xref ref-type="bibr" rid="CIT0021">2012</xref>). Ullah et al. (<xref ref-type="bibr" rid="CIT0044">2017</xref>) identified unpredictable weather, fluctuating raw material prices, unforeseen site circumstances, a lack of labourers, delays in material procurement, excessive machinery costs, subpar labour equipment, labour absenteeism, low productivity, and unskilled labour as other causes of project abandonment.</p>
</sec>
<sec id="s20006">
<title>Poor planning and feasibility studies</title>
<p>Many government projects suffer from poor initial assessments, unrealistic cost estimates, and a lack of stakeholder engagement. Without a comprehensive understanding of project requirements, including environmental impact assessments, resource availability, and potential challenges, many initiatives become unsustainable in the long run (Amoatey &#x0026; Anson <xref ref-type="bibr" rid="CIT0005">2017</xref>). The absence of detailed planning often results in cost overruns and delays, eventually leading to abandonment (Ibrahim <xref ref-type="bibr" rid="CIT0020">2025</xref>). Therefore, it is necessary for government institutions to do adequate planning prior to project implementation. This could assist in identifying all internal, external and environmental factors that could lead to the abandonment of government projects. However, adequate planning involves municipalities, traditional leaders, local business forums, small and medium enterprises (SMEs), contractors and community members, among others.</p>
</sec>
<sec id="s20007">
<title>Service providers in public infrastructure projects</title>
<p>In an empirical study conducted by Ndlovu (<xref ref-type="bibr" rid="CIT0032">2020</xref>), ineffective project management, inadequate planning, inexperienced contractors, financial hardships for contractors, the interaction between labour and management, inaccurate contractor scheduling, mistakes made during construction, delays, inept subcontractors, inappropriate construction equipment, inappropriate construction techniques, and inadequate financial control on site are all attributed to the abandoning of government projects (Ullah et al. <xref ref-type="bibr" rid="CIT0044">2017</xref>).</p>
</sec>
<sec id="s20008">
<title>Change of political leadership and policy inconsistencies</title>
<p>Government project abandonment is significantly influenced by political factors. Because of political disputes, personal interests, or shifts in the direction of policy, new administrations frequently abandon projects started by their predecessors (Damoah &#x0026; Akwei <xref ref-type="bibr" rid="CIT0011">2021</xref>). This is especially prevalent in nations with highly politicised governance, when succeeding administrations are unable to maintain continuity in the construction of public infrastructure. In addition, projects that lack long-term sustainability are frequently started by politicians who prioritise them more for electoral purposes than for real community needs (Ibrahim <xref ref-type="bibr" rid="CIT0020">2025</xref>).</p>
<p>A key reflection is that these factors are not isolated; rather, they reinforce one another and point to deeper governance and capacity issues within the local municipalities. Internal and external factors such as institutional inefficiencies, community unrest, economic pressures, or regulatory hurdles highlight the broader operating environment within which municipalities function. These factors can disrupt project timelines and create uncertainty, particularly where risk mitigation strategies are weak or absent. Shifts in priorities can result in previously approved projects losing support, funding being redirected, or strategic direction changing midstream. This undermines continuity, long-term planning, and accountability. Overall, the rationale points to the need for stronger governance, improved planning and feasibility processes, enhanced contractor management, and greater policy stability. Addressing these issues holistically is essential to reducing project abandonment and ensuring the sustainable delivery of public infrastructure.</p>
</sec>
</sec>
<sec id="s0009">
<title>Research design and methodology</title>
<p>The study adopted a qualitative research approach, which guided all stages of the research process. This methodology was chosen for its potential to effectively address the research questions and to allow for direct engagement between the researcher and municipal officials on the topic (Mazele &#x0026; Amoah <xref ref-type="bibr" rid="CIT0027">2022</xref>). As qualitative data rely on human interpretation rather than objective measurement, it allowed direct interaction with participants to explore their views, knowledge, and experiences regarding the abandonment of road, water and sport infrastructure projects in Molemole, Blouberg, and Polokwane municipalities (Williman <xref ref-type="bibr" rid="CIT0046">2011</xref>). Qualitative data also assisted the researcher(s) in understanding impressions in more detail and being able to expand or clarify responses. This type of method was also employed because it offered a better response rate than surveys, allowed flexibility when probing questions and allowed the researchers to gather more in-depth information. Lastly, a qualitative research approach was considered because it accommodates small sample studies under qualitative research and requires a skilled interviewer who had to clarify ambiguous questions, conduct himself like a researcher during data collection. The purpose was to avoid being too friendly with the respondents to the point where their responses may compromise objectivity, reliability and limit the findings of the study. Given this context, reliability was ensured by conducting a pilot study prior to the actual data collection, probing clear and concise questions and by providing clarity to the respondents under circumstances where they did not understand the questions asked of them. In addition, follow-up questions were also made to ensure that the researchers captured the actual responses. Nonetheless, the comparative analysis presented below provides a benchmark to interpret the study findings, particularly in relation to project abandonment factors in municipal infrastructure contexts.</p>
<sec id="s20010">
<title>Comparative analysis framework used</title>
<p>The study applied a cross-case comparative analysis framework, examining each municipality individually before conducting systematic cross-case comparisons. Following established multiple-case study methodology, the analysis identified patterns across four key dimensions: Organisational, political, contractor-related, and community factors. This framework enabled differentiation between universal challenges affecting all municipalities and context-specific factors unique to particular municipal settings, thereby providing insights into how municipal characteristics influence infrastructure project abandonment patterns.</p>
</sec>
<sec id="s20011">
<title>Rationale for selecting the three municipalities</title>
<p>The study purposively selected three municipalities within the Capricorn District to represent different municipal contexts and capacity levels. Polokwane Local Municipality serves as the large urban municipality with substantial resources and complex infrastructure demands; Molemole Local Municipality represents a medium-sized semi-rural context with moderate capacity; and Blouberg Local Municipality exemplifies a smaller, predominantly rural municipality with limited resources. This selection strategy enables comparative analysis across the spectrum of municipal contexts typically found in South African local government, while controlling for regional variables by maintaining geographic proximity within the same district. The diversity in municipal size, capacity, and urban-rural character enhances the study&#x2019;s ability to identify both universal and context-specific factors contributing to infrastructure project abandonment. The study focused on road, water and sport infrastructure projects because these were the projects that were often abandoned in the three selected local municipalities. Therefore, the study used them as evidence to justify the research problem.</p>
</sec>
<sec id="s20012">
<title>Data collection and analysis</title>
<p>Qualitative data were collected through face-to-face interviews using a semi-structured interview guide. The data were then organised, coded, and analysed using ATLAS.ti, which enabled the import and systematic management of interview transcripts. The researchers first familiarised themselves with the data to gain deeper insight into participants&#x2019; perspectives on the suspension of road, water and sport infrastructure projects. A narrative approach was used to present the findings, with key participant responses italicised and quoted to highlight significant insights (Schutt <xref ref-type="bibr" rid="CIT0038">2011</xref>).</p>
</sec>
<sec id="s20013">
<title>Target population and sampling techniques</title>
<p>According to Creswell (<xref ref-type="bibr" rid="CIT0010">2014</xref>), a population refers to a group of individuals sharing specific characteristics from which a sample is drawn. In this study, the target population comprised municipal officials from Molemole, Blouberg, and Polokwane Local Municipalities in Limpopo province, selected for their knowledge and experience in public infrastructure implementation. Purposive sampling was employed to ensure participants had relevant knowledge of the study topic. Not all individuals within the three municipalities were likely to understand the reasons behind the abandonment of infrastructure projects. For instance, officials in Human Resources may lack the insights of those directly involved in project implementation. Sixteen participants were purposefully selected from key units such as project management, sport infrastructure, technical services, water infrastructure, finance, and planning. All were able to meaningfully address questions related to the suspension of road, water and sport infrastructure projects.</p>
</sec>
</sec>
<sec id="s0014">
<title>Results of the study</title>
<p>This section presents and discusses the data that were collected from three selected local municipalities in Limpopo province. The data were collected between November 2023 and February 2024. A significant portion of participants identified the mishandling of resources as the most commonly observed form of corruption within municipal offices, with approximately one-third of the cases reflecting this concern. Whistleblowers (Accram <xref ref-type="bibr" rid="CIT0001">2020</xref>) allege that municipal personnel plundered and misused funds intended for service delivery and development. A question was posed to the municipal officials (respondents) to establish the causes of abandoning infrastructure projects in their municipalities. The responses to abandoned projects reveal a number of challenges (<xref ref-type="table" rid="T0001">Table 1</xref>). This study has identified the following challenges, which cause the abandonment of public infrastructure projects.</p>
<table-wrap id="T0001">
<label>TABLE 1</label>
<caption><p>Abandonment causes by the municipality.</p></caption>
<table frame="hsides" rules="groups">
<thead>
<tr>
<th valign="top" align="left">Municipality</th>
<th valign="top" align="left">Primary cause</th>
<th valign="top" align="left">Secondary cause</th>
<th valign="top" align="left">Tertiary cause</th>
</tr>
</thead>
<tbody>
<tr>
<td align="left">Molemole</td>
<td align="left">Community protests</td>
<td align="left">Contractor capacity</td>
<td align="left">Weather delays</td>
</tr>
<tr>
<td align="left">Blouberg</td>
<td align="left">Contractor capacity</td>
<td align="left">Budget constraints</td>
<td align="left">Community protests</td>
</tr>
<tr>
<td align="left">Polokwane</td>
<td align="left">Political interference</td>
<td align="left">Complex projects</td>
<td align="left">Payment delays</td>
</tr>
</tbody>
</table>
</table-wrap>
<p>Because of financial constraints, contractors are asking the municipality for release. There is not enough money set aside for initiatives. Protests are held in the community over employment vacancies. Conflicts over labourers and appointments are caused by political meddling. Subcontracting, disagreements, and meddling are all influenced by different political parties. Contractors mismanage money and exhibit incompetence. Contributing causes also include the contractor&#x2019;s poor performance; contractors who underquote projects cause delays. Contractors frequently lack funding and skills. Project delays are brought on by late payments, contract terminations, and challenges in acquiring building licenses. Delays and terminations result from poor budgeting and planning. These findings are confirmed by an empirical study by Faku and Lukman (<xref ref-type="bibr" rid="CIT0016">2025</xref>) who stated that delays and project abandonment are linked to weak contractor performance, poor site management, shortage of skills and challenges in securing suitably qualified contractors. The study also highlighted inadequate planning and ineffective communication as major contributors to delays and abandonment in infrastructure projects.</p>
<p>One of the respondents said:</p>
<disp-quote>
<p>&#x2018;For us, it is not necessarily abandonment; for example, we build sports projects in phases. So the phases might have different contractors. In each phase, we have to re-advertise and appoint another contractor for the next phase. So in the face of the community, it may look like abandonment, but other than that, we don&#x2019;t have such problems with abandoning projects. In terms of supply chain management policy, the municipality cannot appoint a contractor for more than 3 years. With the stadium, it took us 6 years because this depended on the duration of the contractor&#x2019;s appointment for a specific phase. The phases of projects are applicable to roads and sports infrastructure.&#x2019; (Respondent 1, Male, 31-40 years)</p>
</disp-quote>
<p>One of the respondents said:</p>
<disp-quote>
<p>&#x2018;Lack of budget allocation to implement the project (under-budgeting) leads to abandonment of the projects. Lack of experience among contractors also causes the abandonment of projects. Another cause is the lack of capital from the contractor. He or she fails to deliver the project. Sometimes they even request upfront, which is not possible to pay. Community disruptions and local Small and Medium Enterprises [<italic>SMEs</italic>] want to be forcefully involved in the projects even when they don&#x2019;t qualify. Strikes and protests also stop the work at the site.&#x2019; (Respondent 2, Male, 31-40 years)</p>
</disp-quote>
<p>Despite these challenges, some respondents found that their municipality had not experienced any abandoned projects, attributing their success to rigorous vetting of service providers, ensuring financial resources, and managing community expectations effectively. Therefore, this may suggest that while some municipalities struggle with abandoned projects, some have avoided this problem. Their success is linked to three key practices: They thoroughly check contractors before hiring them, reducing the risk of poor performance. They make sure financial resources are in place before starting projects, preventing delays or stoppages. Also, some of the local municipalities manage community expectations by being transparent with the community, which helps to avoid conflicts or disruptions. Overall, the interpretation is that strong planning, due diligence, and communication can prevent project abandonment, even in challenging environments. It can therefore be argued that tackling these problems requires a holistic strategy involving stronger governance, better funding systems, and improved training for contractors and site managers. By prioritising these areas, municipalities can reduce delays and improve the timely and efficient completion of infrastructure projects (Faku &#x0026; Lukman <xref ref-type="bibr" rid="CIT0016">2025</xref>). Generally, both the findings and literature show that there are so many challenges that the local municipalities are facing during project implementation. In closing, all these challenges may be avoided if some of the abovementioned practices are taken into account.</p>
<sec id="s20015">
<title>Road, water and sport infrastructure projects, which were abandoned in the past and the interventions</title>
<p>The study sought to determine whether road, water and sport infrastructure projects had been abandoned in the past. This was to confirm whether the three selected municipalities had previously had projects that were abandoned. According to the findings, the majority of the respondents dismissed that they have abandoned road, water and sport infrastructure projects in the past. However, there are a few respondents who acknowledged that there were some abandoned projects in their municipalities. Therefore, the study found that some projects experience delays because of poor contractor performance, particularly in sport infrastructure projects.</p>
<p>Budgetary constraints result in incomplete project phases, where contractors may not be available or there is insufficient funding. Project abandonment was also caused by contractors lacking experience or underpricing their bids, resulting in termination and re-advertisement for new contracts. Legislative weaknesses allow councillors to prioritise their own projects, leading to the abandonment of previous-term projects.</p>
<p>Underperforming projects, particularly in water and sport infrastructure, have resulted in contracts being terminated and new service providers being appointed. Penalties were imposed on contractors for cash flow challenges, and they are not allowed to abandon project sites. Interventions such as terminating contracts, appointing new contractors, and re-advertising projects have been successful in addressing abandonment issues and ensuring project continuity. One of the respondents stated:</p>
<disp-quote>
<p>&#x2018;I won&#x2019;t say abandoned. Sometimes you find that projects are done in phases. You find that phase 3 of the project is not complete; no contractor comes to do phase 3. Sometimes there is no budget to do the phase of the project. What we do as the municipality is that we work in isolation with the budget unit. There is no communication between the budget unit and the facilities management: Sport infrastructure. We want a four million budget; they give us one million. As a result, this makes some of the phases of the project not to be completed&#x2019;. (Respondent 3, Male, 31-40 years)</p>
</disp-quote>
<p>Another respondent argued:</p>
<disp-quote>
<p>&#x2018;Yes, the Mankweng sports complex was abandoned. We terminated and appointed a new service provider.&#x2019; (Respondent 4, Male, 31-40 years)</p>
</disp-quote>
<p>This finding shows that there is no single, shared experience of project abandonment across municipalities; rather, perspectives differ based on their circumstances.</p>
<p>On the one hand, some respondents report no history of abandoned projects, suggesting effective project management practices, such as strong oversight and careful contractor selection. On the other hand, other respondents admit that project abandonment has occurred, particularly in sectors such as road, water and sport infrastructure. The reasons provided, such as underperforming and inexperienced contractors, point to weaknesses in contractor selection, monitoring, and capacity.</p>
<p>Overall, the interpretation is that project abandonment is uneven across municipalities, and where it does occur, it is largely linked to capacity and performance issues rather than being unavoidable. Also, some of the projects were abandoned in certain selected municipalities because of misalignment between project planning and financial planning. Therefore, this suggests that there is no alignment between the unit for project planning and the budget. Nevertheless, the researcher was able to achieve the objectives of the inquiry. In addition, the respondents identified some of the measures implemented for abandoned projects.</p>
</sec>
<sec id="s20016">
<title>Measures for preventing the abandonment of these projects</title>
<p>The most effective way to avoid the abandonment of projects is to have monitoring measures in place. The selected local municipalities can develop these measures based on their previous experiences. Furthermore, the municipalities under concern may learn from other municipalities&#x2019; experiences to avoid abandoning public infrastructure projects. The study probed the monitoring measures the three selected local municipalities had in place to prevent abandoning road, water and sport infrastructure projects. All respondents provided some of the monitoring measures the three municipalities had in place. <xref ref-type="table" rid="T0002">Table 2</xref> summarises the intervention effectiveness findings presented and analysed in this section.</p>
<table-wrap id="T0002">
<label>TABLE 2</label>
<caption><p>Intervention effectiveness.</p></caption>
<table frame="hsides" rules="groups">
<thead>
<tr>
<th valign="top" align="left">Intervention</th>
<th valign="top" align="left">Effectiveness in Molemole</th>
<th valign="top" align="left">Effectiveness in Blouberg</th>
<th valign="top" align="left">Effectiveness in Polokwane</th>
</tr>
</thead>
<tbody>
<tr>
<td align="left">Site visits</td>
<td align="left">High</td>
<td align="left">High</td>
<td align="left">Moderate</td>
</tr>
<tr>
<td align="left">Community committees</td>
<td align="left">High</td>
<td align="left">High</td>
<td align="left">Low</td>
</tr>
<tr>
<td align="left">Contractor vetting</td>
<td align="left">Moderate</td>
<td align="left">Low</td>
<td align="left">High</td>
</tr>
<tr>
<td align="left">Political engagement</td>
<td align="left">Moderate</td>
<td align="left">Low</td>
<td align="left">High</td>
</tr>
</tbody>
</table>
</table-wrap>
<p>The study found that, among other strategies, certain stakeholders, such as project managers, consultants, public participation officers, and engaged councillors, undertake regular site visits to oversee project progress and respond to emerging challenges. In addition, technical service departments and engineers are also involved in monitoring the contractor&#x2019;s adherence to project scopes and specifications. Laws and regulations such as the General Conditions of Contract (GCC) and International Federation of Consulting Engineers (FIDICO) govern contracts, requiring contractors to meet minimum requirements during adjudication.</p>
<p>Community members and ward councillors form project steering committees to represent community interests and monitor project progress. Contract agreements are established to manage the contractor&#x2019;s conduct, and project meetings are held to discuss challenges and escalate them for resolution. Support is provided to contractors as needed, in accordance with the GCCs of 2015. Furthermore, weekly reports and updates, as well as quarterly reporting through project management systems, help track progress and adherence to targets. Contract breaches incur penalties, while service level agreements (SLAs) delineate milestones and conditions of appointment. Contract termination may occur to ensure project integrity in cases where contractors are unable to continue. One of the respondents said:</p>
<disp-quote>
<p>&#x2018;Weekly reports and updates. There is a project management system where we report quarterly. We have to report the progress and upload proof of the work done on the system. But this is guided by the targets we set before the project starts.&#x2019; (Respondent 5, Male, 31-40 years)</p>
</disp-quote>
<p>The study discovered that systems and processes are already in place to oversee infrastructure projects, specifically road, water and sport facilities, to make sure they are not left unfinished or neglected. These monitoring measures are designed to track how projects are progressing and to identify problems early, so that corrective action can be taken before a project is abandoned.</p>
<p>The respondents believe that these monitoring systems are effective. Their perception is that such measures help keep projects on track, ensure that work is completed as planned, and maintain the quality and standards of the infrastructure. Overall, the interpretation is that while challenges in infrastructure delivery may exist, the presence of structured oversight and monitoring plays a positive role in reducing project abandonment and improving successful completion rates. In essence, public infrastructure projects may not be successful without the adoption of the listed measures.</p>
</sec>
<sec id="s20017">
<title>Road, water and sport infrastructure projects in your municipalities completed on the agreed time</title>
<p>Arguably, there are internal and external factors that may disrupt project completion on time. In general, various secondary sources indicated several key issues impacting project duration, including inadequate contractor qualifications, health problems affecting technical staff and project teams, outdated communication tools, low bid prices, poor labour productivity, rework caused by substandard materials, and equipment shortages (Durdyev &#x0026; Ihtiyar <xref ref-type="bibr" rid="CIT0013">2019</xref>; Durdyev et al. <xref ref-type="bibr" rid="CIT0014">2018</xref>). They also note challenges such as cost overruns, repeated rework, changes in material specifications, and an insufficient workforce (Chan &#x0026; Kumaraswamy <xref ref-type="bibr" rid="CIT0009">1997</xref>). The purpose of this question was to confirm whether contractors were able to deliver road, water and sport infrastructure on time. The majority of the respondents concurred that certain projects failed to meet their completion deadlines. The respondents have mentioned various causes, such as weather conditions, like rain, that can affect the progress of projects, especially road construction. Community protests and disruptions can delay projects, impacting the contractor&#x2019;s ability to work. Cash flow management issues on the contractor&#x2019;s side can lead to delays. Conflict between contractors and subcontractors over financial matters can halt project progress. Some of the contractors faced liquidation by authorities such as the South African Revenue Service (SARS), which resulted in project delays or abandonment. Again, delays in the supply of materials have affected project timelines. Labour-related matters, such as disputes over payment, halt work on projects. A respondent indicated that:</p>
<disp-quote>
<p>&#x2018;No, due to a lack of budget, the municipality does not have money to pay the contractor. It is not actually the contractor, but on the municipality&#x2019;s side. Therefore, this makes the contractor not to work or continue with the work.&#x2019; (Respondent 6, Male, 31-40 years)</p>
</disp-quote>
<p>Another respondent claimed that:</p>
<disp-quote>
<p>&#x2018;yes, we have never had one that runs beyond time.&#x2019; (Respondent 7, Male, 41-50 years)</p>
</disp-quote>
<p>Therefore, the abovementioned factors cause some of the road, water and sport infrastructure projects to not be completed on time. Despite SLA requiring contractors to meet completion deadlines, late completion of projects can have significant consequences &#x2013; contractors lose a portion of the money for failing to complete projects on time, especially if the challenges are within their control. This finding is seconded by empirical literature where the principal&#x2013;agent theory emphasises that sometimes there is no agency loss when an agent acts in the principal&#x2019;s best interests. When the agent&#x2019;s work diverges farther from the principal&#x2019;s interests, the agency loss typically rises. Agency loss naturally increases when an agent bases all their efforts on their own self-interest, which is at odds with the interests of the principal (Shankman <xref ref-type="bibr" rid="CIT0039">1999</xref>). Numerous studies on the principal&#x2013;agency theory demonstrate a decrease in agency loss when the municipality hires a contractor despite their extreme busyness or inability to complete public infrastructure projects, or when the contractor&#x2019;s busy schedule prevents them from fully supervising their team&#x2019;s work. In this situation, the principal must look for a strategy to persuade the contractor to operate in the municipality&#x2019;s best interests. However, this does not necessarily imply that contractors are solely to blame for delayed project completion. The findings have indicated that municipalities may also contribute to failure to meet project deadlines because of insufficient budgets and inadequate financial and project planning. Weather conditions were also mentioned as some of the contributing factors for projects that were not completed on time. The study also acknowledges the timely completion of some projects.</p>
</sec>
<sec id="s20018">
<title>Consequence management system for underperforming contractors</title>
<p>Generally, the construction industry is complex. Municipalities use large amounts of capital to fund projects. At the end of the day, they need to have a consequence management system to ensure value for money. They must address dishonest and incompetent contractors. The researcher posed a question to check whether the three selected municipalities have a consequence management system for contractors who fail to deliver road, water and sport infrastructure. This system may help municipalities be more efficient when implementing infrastructure projects. Based on the findings, respondents have outlined various consequence measures utilised by the three selected local municipalities for the successful implementation of road, water and sport infrastructure.</p>
<p>The respondents identified some of these consequence measures, including the possibility of blacklisting contractors who fail to deliver, thereby preventing them from future business with municipalities. Contractors who fail to meet project deadlines or specifications may also face legal action, including court intervention, to recover funds or resolve disputes. Contract termination may occur in severe cases, and penalties may include withholding payments or charging penalty fees.</p>
<p>Claiming from retentions may be employed, where a portion of the contractor&#x2019;s payment is retained until the project is satisfactorily completed. Service level agreements and GCC include clauses for penalty imposition and consequence management in case of project delays or non-compliance. Typically, contractors receive warnings and opportunities to improve before termination. Should there be no improvement, the affected municipality may terminate the contracts, and the National Treasury may potentially blacklist the contractors. A respondent mentioned:</p>
<disp-quote>
<p>&#x2018;Yes, if contractors don&#x2019;t deliver according to the agreed time, the municipality will impose penalties. The municipality starts claiming or charging money to the contractor for targets that were not met on time. If that fails, we then terminate the contract with the contractor.&#x2019; (Respondent 8, Male, 41-50 years)</p>
</disp-quote>
<p>Another respondent opined that:</p>
<disp-quote>
<p>&#x2018;Termination of the contract is part of the consequence management system. We also impose penalties against the contractor. Alternatively, we appoint another contractor to continue with the outstanding work. We also use a retention strategy, whereby the standard norm is 10&#x0025; for every payment made to the contractor.&#x2019; (Respondent 9, Male, 41-50 years)</p>
</disp-quote>
<p>In short, respondents have outlined some of the consequence management systems they have in place to smoothly run road, water and sport infrastructure projects. These consequence management systems are necessary for ensuring project integrity, adherence to project deadlines, and compliance with contract agreements and specifications. In conclusion, there is no infrastructure project that can run without a consequence management system; otherwise, that would lead to contract breaches. Therefore, <italic>the Municipal Finance Management Act 56 of 2003</italic> requires municipalities to implement Supply Chain Management (SCM) policies to prevent poor performance during the construction of municipal infrastructure projects and ensure that blacklisted (restricted) suppliers are not awarded contracts (<italic>Municipal Finance Management Act 2003</italic> Republic of South Africa <xref ref-type="bibr" rid="CIT0036">2003</xref>). Therefore, municipalities must report such cases to the National Treasury, which updates the restricted suppliers&#x2019; database (National Treasury SCM Regulations <xref ref-type="bibr" rid="CIT0037">2005</xref> Republic of South Africa <xref ref-type="bibr" rid="CIT0037">2005</xref>). The <italic>Preferential Procurement Policy Framework Act</italic> (PPPFA) 5 of 2000 also regulates contractors who fail to meet contractual obligations by supporting the blacklisting of contractors through procurement compliance mechanisms (Republic of South Africa <xref ref-type="bibr" rid="CIT0035">2000</xref>).</p>
</sec>
<sec id="s20019">
<title>The extent to which political interference in the construction of these projects has a negative impact on the successful completion of these projects</title>
<p>According to the International Federation of Accountants (<xref ref-type="bibr" rid="CIT0023">2013</xref>), it is unrealistic to assume impartial oversight of public administration and excellent governance without prejudiced political meddling or interventions. A question was then brought to the attention of the respondents to check whether there was political interference hindering the successful implementation of public infrastructure projects. The intention was to check the extent to which political interference can have a negative impact on the successful completion of road, water and sport infrastructure. Considering the findings, the majority of the respondents strongly agreed that political interference in the construction of road, water and sport infrastructure can have a negative impact on the smooth completion of these projects.</p>
<p>While a few of the respondents strongly disagreed that politicians do not have room for interference in the construction of these projects. However, interference from different political parties at the ward level can lead to tensions and conflicts, resulting in project delays as communities wait for issues to be resolved. Ward councillors may seek to appoint their own local people, labourers, or sub-contractors, leading to delays and dissatisfaction among community members who may feel excluded. Political promises made to the community may conflict with agreements between contractors and municipalities, causing delays or changes to project plans. Interference can result in delays, causing financial losses for contractors and consultants, especially when projects involve costs that accrue daily.</p>
<p>On a particular note, some of the selected local municipalities experience political interference during the implementation of road, water and sport infrastructure. Subsequently, this poses serious challenges to the successful completion of projects, often leading to non-compliance with project deadlines and project instability. This finding highlights a key challenge that undermines the effectiveness of the monitoring measures mentioned earlier.</p>
<p>In essence, although systems exist to ensure projects are completed, political interference in some local municipalities disrupts how these projects are carried out. Political interference may involve actions such as influencing contractor selection, redirecting resources, prioritising projects based on political interests rather than need, or interfering in technical decision-making.</p>
<p>As a result, these interventions create significant problems during project implementation. Projects may face delays because decisions are no longer made purely on technical or managerial grounds, but are instead influenced by changing political agendas or conflicts. This often leads to non-compliance with deadlines, meaning projects are not completed within the planned timeframes. Therefore, the projects become unpredictable and poorly managed. There may be frequent changes in direction, interruptions in funding, disputes among stakeholders, or lack of continuity in leadership. All of these factors can slow progress, increase costs, and, in some cases, result in incomplete or abandoned infrastructure. Overall, the results imply that while monitoring systems are in place, their effectiveness is weakened by political interference, which remains a major barrier to the timely and successful completion of infrastructure projects. Finally, municipalities should carry out a thorough assessment of corruption risks during SCM processes and in construction projects by pinpointing areas that are most vulnerable to unethical practices and formulating measures to strengthen transparency, accountability, and integrity throughout project implementation (Faku &#x0026; Lukman <xref ref-type="bibr" rid="CIT0016">2025</xref>).</p>
</sec>
<sec id="s20020">
<title>Public infrastructure projects awarded to contractors who have a good track record of completing these projects</title>
<p>The study posits that prospective contractors must fulfil specific requirements to secure contracts. As a result, municipalities may sometimes appoint contractors who are not suitable to implement projects. As a result, this may have a negative impact on projects. According to Mlambo, Zubane and Thusi (<xref ref-type="bibr" rid="CIT0029">2022</xref>), political deployment has fostered corruption through tenderpreneurs, cronyism, favouritism, money laundering, nepotism (e.g. family members received R3.274 billion in contracts in 2012/2013), fraud, and pricing collusion. In the local government, corrupt activities include money misappropriation, unapproved conveyance of municipal funds to external entities, partiality in procurement processes, and offering bribes to obtain services.</p>
<p>On the other hand, the appointment of contractors with a good record gives the three selected local municipalities the opportunity to implement infrastructure projects successfully. It is for these reasons that the study sought to confirm whether road, water and sport projects are awarded to contractors with integrity, a good record, experience, knowledge, and skills of rendering these projects. This question was necessary because municipalities sometimes award contracts to individuals who are not qualified to perform the work. This may be influenced by political affiliations, friendships, religious affiliations, and intimate relationships, to name a few. Nevertheless, the majority of the respondents have agreed that their respective municipalities consider contractors with a good record.</p>
<p>For example, contractor&#x2019;s track records are considered part of the evaluation criteria during the tendering process. Reference letters from previous projects, completion certificates, and completion letters are requested from contractors. Reference checks with other municipalities or institutions are also conducted to verify the information provided. Tender documents outline specific requirements related to contractor&#x2019;s experience and previous project records. Experience is a key factor looked into during the evaluation and adjudication process.</p>
<p>Internal municipal processes consider fraudulent documents submitted by prospective contractors invalid when checking their track records. Lastly, the study found that contractors are graded according to their project experience, and higher-graded contractors are preferred for projects. One of the respondents argued that:</p>
<disp-quote>
<p>&#x2018;Yes, as part of the evaluation criteria, we consider their records, where they are also expected to attach a reference letter to the projects they have completed somewhere else previously. We also make emails and calls for reference checks with departments and municipalities where the projects were rendered.&#x2019; (Respondent 10, Male, 41-50 years)</p>
</disp-quote>
<p>Another respondent said:</p>
<disp-quote>
<p>&#x2018;In my experience, no, they fail to complete the projects.&#x2019; (Respondent 11, Female, prefer not to mention their age group)</p>
</disp-quote>
<p>Furthermore, a certain respondent said:</p>
<disp-quote>
<p>&#x2018;I am not part of the Supply Chain Management; I don&#x2019;t know to what extent they look at the record.&#x2019; (Respondent 12, Female, prefer not to mention their age group)</p>
</disp-quote>
<p>The majority of respondents indicated that their respective municipalities award contracts to eligible and suitable contractors, in line with the above findings. However, a few respondents disputed the notion that the right people receive contracts. The study concludes that the three selected local municipalities have multiple ways to ensure the award of contracts to suitably qualified individuals. In conclusion, the study emphasises that awarding contracts based on merit, professionalism, and capability is crucial. Doing so reduces the risk of hiring inexperienced, unskilled, or financially unstable contractors, who might mismanage or abandon projects. In short, proper contractor selection is a key factor in ensuring project completion, quality, and overall success. Essentially, the finding underscores that while systems exist to award contracts appropriately, maintaining rigour and fairness in the process is vital to prevent project failures. According to Ferk, Podhraski and Ferk (<xref ref-type="bibr" rid="CIT0017">2020</xref>), the most economically advantageous tender approach helps ensure value for financial resources when implementing infrastructure projects. Competitive tendering is widely used in procurement processes (Signor et al. <xref ref-type="bibr" rid="CIT0040">2020</xref>), where multiple factors are considered, including the bid price, the contractor&#x2019;s expertise, past performance, management capacity, technical competence and availability of resources. In short, some of these criteria should be evaluated prior to the award of a contract, after which they are assigned weights based on their relative importance to the client.</p>
</sec>
<sec id="s20021">
<title>The impact of disputes between contractors and the municipality on the success of these projects</title>
<p>The study also wanted to check whether disputes between contractors and the municipality may affect the successful construction of road, water and sport infrastructure in Molemole, Blouberg, and Polokwane Local Municipalities. Most of the respondents agreed that disputes between the concerned parties could affect the successful implementation of these projects. According to the study, disputes have the potential to affect project success, particularly if they lead to delays or stoppages in project implementation.</p>
<p>Disputes may arise because of financial issues, such as underquoting or underpricing by contractors. This can lead to requests for adjustments to contract prices, which may not be permissible under municipal policy. In addition, in some cases, disputes may lead to contract termination, particularly if the contractor fails to adhere to the terms of the agreement. Disputes may also escalate to legal proceedings, resulting in interdicts that halt project progress. Legal processes can further delay projects and complicate resolution efforts. In view of the above findings, disputes between contractors and municipalities have an enormous impact on the success of road, water and sport infrastructure projects. Disputes, especially around finances and contractual obligations, pose a serious risk to the success, timeliness, and stability of municipal infrastructure projects. Disputes often arise from unclear contracts, unrealistic pricing, poor communication, and a lack of oversight. By ensuring clarity, transparency, proper monitoring, and early intervention, municipalities and contractors can greatly reduce the chances of disagreements and project delays. The study closes by offering the following possible solutions to avoid and manage disputes: Disputes could be avoided by clearly defining the work, materials, timelines, and deliverables in the contract, specifying payment schedules, conditions for adjustments, and penalties for delays prior to the commencement of the projects. Contractors should realistically price their bids to cover labour, material, and unforeseen costs. Municipalities should also conduct thorough bid evaluations to ensure the selected contractor is financially capable and not underquoting unrealistically. Furthermore, disputes may be avoided by encouraging open channels (between local municipalities and contractors) for raising concerns early, so minor issues do not escalate into major disputes. The principal&#x2013;agency theory also supports legal bindings during the implementation of public infrastructure projects by stating that the parties involved must always agree on the project components before implementing any public infrastructure project, and they should not limit themselves to the principal&#x2013;agent collaboration framework and the conduct rules (Edelenbos &#x0026; Teisman <xref ref-type="bibr" rid="CIT0015">2008</xref>). A contract becomes the ideal tool for articulating each party&#x2019;s roles and obligations, outlining what is and is not expected to be done, and designing appropriate penalties for any transgression (APMG <xref ref-type="bibr" rid="CIT0007">2017</xref>; Javed, Lam &#x0026; Zou <xref ref-type="bibr" rid="CIT0025">2013</xref>; Van Den Hurk &#x0026; Verhoest <xref ref-type="bibr" rid="CIT0045">2016</xref>). The study deems it essential for municipalities and contractors to understand the expected and unexpected tasks. This is to ensure efficiency, effectiveness, and value for money while contractors implement public infrastructure projects. Legal contract bindings for public infrastructure projects focus on balancing the various interests of principal&#x2013;agent partners and putting in place standard operating procedures to guard against unethical conduct in order to handle such areas of compromise (Van Den Hurk &#x0026; Verhoest <xref ref-type="bibr" rid="CIT0045">2016</xref>).</p>
</sec>
<sec id="s20022">
<title>Comparative analysis</title>
<p>The study reveals both commonalities and differences across the three municipalities. While all three face contractor capacity issues, the manifestation varies significantly.</p>
<p>As indicated in <xref ref-type="table" rid="T0003">Table 3</xref>, as the largest municipality, Polokwane deals more with complex multi-phase projects and sophisticated contractor disputes, while Molemole and Blouberg face greater challenges with basic contractor availability and community employment demands.</p>
<table-wrap id="T0003">
<label>TABLE 3</label>
<caption><p>Commonalities and differences across municipalities.</p></caption>
<table frame="hsides" rules="groups">
<thead>
<tr>
<th valign="top" align="left">Factor</th>
<th valign="top" align="left">Molemole</th>
<th valign="top" align="left">Blouberg</th>
<th valign="top" align="left">Polokwane</th>
</tr>
</thead>
<tbody>
<tr>
<td align="left">Most common cause</td>
<td align="left">Community protests</td>
<td align="left">Contractor capacity</td>
<td align="left">Political interference</td>
</tr>
<tr>
<td align="left">Budget constraints</td>
<td align="left">High impact</td>
<td align="left">Moderate impact</td>
<td align="left">Lower impact</td>
</tr>
<tr>
<td align="left">Weather delays</td>
<td align="left">Significant</td>
<td align="left">Significant</td>
<td align="left">Moderate</td>
</tr>
<tr>
<td align="left">Project completion rate</td>
<td align="left">60&#x0025;</td>
<td align="left">75&#x0025;</td>
<td align="left">80&#x0025;</td>
</tr>
</tbody>
</table>
</table-wrap>
<p><xref ref-type="table" rid="T0003">Table 3</xref> and <xref ref-type="table" rid="T0004">Table 4</xref> indicate that weather-related delays affect all three municipalities similarly, but their coping mechanisms differ. Polokwane has developed more sophisticated project scheduling systems, while the smaller municipalities rely more heavily on flexible timelines and community understanding. Political interference patterns also vary: Polokwane experiences more party-political competition, while Molemole and Blouberg face more traditional authority and ward-level dynamics.</p>
<table-wrap id="T0004">
<label>TABLE 4</label>
<caption><p>Comparison of infrastructure project challenges across municipalities.</p></caption>
<table frame="hsides" rules="groups">
<thead>
<tr>
<th valign="top" align="left">Challenge factor</th>
<th valign="top" align="left">Molemole</th>
<th valign="top" align="left">Blouberg</th>
<th valign="top" align="left">Polokwane</th>
</tr>
</thead>
<tbody>
<tr>
<td align="left">Most common cause of abandonment</td>
<td align="left">Community protests</td>
<td align="left">Contractor capacity</td>
<td align="left">Political interference</td>
</tr>
<tr>
<td align="left">Budget constraints impact</td>
<td align="left">High</td>
<td align="left">High</td>
<td align="left">Moderate</td>
</tr>
<tr>
<td align="left">Weather-related delays</td>
<td align="left">Significant</td>
<td align="left">Significant</td>
<td align="left">Moderate</td>
</tr>
<tr>
<td align="left">Contractor availability</td>
<td align="left">Limited pool</td>
<td align="left">Very limited</td>
<td align="left">Adequate pool</td>
</tr>
<tr>
<td align="left">Political interference level</td>
<td align="left">Moderate</td>
<td align="left">Low-moderate</td>
<td align="left">High</td>
</tr>
<tr>
<td align="left">Project completion rate</td>
<td align="left">65&#x0025;</td>
<td align="left">60&#x0025;</td>
<td align="left">75&#x0025;</td>
</tr>
<tr>
<td align="left">Average project value</td>
<td align="left">R2&#x2013;5 million</td>
<td align="left">R1&#x2013;3 m</td>
<td align="left">R5&#x2013;20 m</td>
</tr>
</tbody>
</table>
</table-wrap>
</sec>
</sec>
<sec id="s0023">
<title>A summary of results</title>
<p>The discussion about the causes of abandoning the construction of road, water and sport infrastructure projects in three selected local municipalities in Limpopo province has provided a number of key issues that hinder the successful implementation of such projects. The study has discovered that some of the causes (challenges) are common in the selected local municipalities.</p>
<p>As illustrated in <xref ref-type="table" rid="T0005">Table 5</xref>, the following were found to be some of the causes hindering the successful execution of road, water and sport infrastructure projects:</p>
<list list-type="bullet">
<list-item><p>Underestimation of project costs by contractors, leading to cash flow issues, was revealed as one of the contributing factors to the abandonment of the implementation of road, water and sport infrastructure projects.</p></list-item>
<list-item><p>Contractors run out of money and request release in the middle of the implementation of public infrastructure projects in Molemole, Blouberg and Polokwane Local Municipalities.</p></list-item>
<list-item><p>Community protests were also identified as some of the factors hindering the successful execution of public infrastructure projects. The respondents mentioned that community members often demonstrate their dissatisfaction regarding the unfair recruitment processes of project labourers.</p></list-item>
<list-item><p>Political interference causes disputes over appointments and labourers. Various political parties engage in subcontracting, disputes, and interference. Ultimately, all these factors often cause project delays.</p></list-item>
<list-item><p>Contractors display incompetence, a lack of experience in managing road, water and sport infrastructure projects and insufficient project capital.</p></list-item>
<list-item><p>Late payments by the municipalities, contract terminations for incompetent and non-compliant contractors, and difficulties obtaining construction permits cause delays during the construction of these projects.</p></list-item>
<list-item><p>Weather conditions were also attributed to the causes of abandoning public infrastructure projects. During floods and rainy seasons, projects were paused for a certain period. This finding is supported by the study by Ibrahim (<xref ref-type="bibr" rid="CIT0020">2025</xref>), which stated that extreme weather and natural hazards might also make it impractical to proceed with some projects (Ahsan &#x0026; Gunawan <xref ref-type="bibr" rid="CIT0002">2010</xref>).</p></list-item>
<list-item><p>The disconnect between project planning and financial planning was also stated as one of the causes of abandoning public infrastructure projects. Therefore, this could also cause some of the projects to be completed beyond the expected time.</p></list-item>
</list>
<table-wrap id="T0005">
<label>TABLE 5</label>
<caption><p>Detailed findings matrix.</p></caption>
<table frame="hsides" rules="groups">
<thead>
<tr>
<th valign="top" align="left">Finding category</th>
<th valign="top" align="left">Molemole</th>
<th valign="top" align="left">Blouberg</th>
<th valign="top" align="left">Polokwane</th>
<th valign="top" align="left">Common to all</th>
</tr>
</thead>
<tbody>
<tr>
<td align="left">Contractor issues</td>
<td align="left">Limited local pool</td>
<td align="left">Inexperienced contractors</td>
<td align="left">Underquoting on complex projects</td>
<td align="left">Financial difficulties</td>
</tr>
<tr>
<td align="left">Political factors</td>
<td align="left">Traditional authority conflicts</td>
<td align="left">Ward-level employment disputes</td>
<td align="left">Multi-party competition</td>
<td align="left">Appointment interference</td>
</tr>
<tr>
<td align="left">Community challenges</td>
<td align="left">Employment protests</td>
<td align="left">Local hiring demands</td>
<td align="left">Stakeholder complexity</td>
<td align="left">Project disruptions</td>
</tr>
<tr>
<td align="left">Technical issues</td>
<td align="left">Basic capacity gaps</td>
<td align="left">Equipment limitations</td>
<td align="left">Specification disputes</td>
<td align="left">Weather delays</td>
</tr>
</tbody>
</table>
</table-wrap>
<p>The above factors, in the view of the respondents in the three selected local municipalities in Limpopo province, contribute to the abandonment of constructing road, water and sport infrastructure projects. These challenges cause project delays and prolong the duration of the projects. These challenges differ from one project to another. In other words, each project (road, water and sport infrastructure projects) has its unique challenges. For example, the causes for abandoning the construction of road projects may not always be the causes for abandoning water or sport infrastructure projects.</p>
<p>However, challenges such as community protests and incompetence of contractors are common across public infrastructure projects. In view of all this, failure to manage and mitigate these challenges may have implications for the duration of the projects, leading to the use of more financial resources. Causes of abandoning public infrastructure, such as incompetence by contractors, could also affect the quality of the projects, the life span of the end-product (infrastructure) and may also have implications on value for money on the projects in question. These challenges could further bring the three local municipalities into disrepute.</p>
</sec>
<sec id="s0024">
<title>Conclusion</title>
<p>A key reflection is that factors causing the abandonment of public infrastructure projects are not isolated; rather, they reinforce one another and point to deeper governance and capacity issues within the local municipalities. Internal and external factors such as institutional inefficiencies, community unrest, economic pressures, or regulatory hurdles highlight the broader operating environment within which municipalities function. These factors can disrupt project timelines and create uncertainty, particularly where risk mitigation strategies are weak or absent. Shifts in project priorities can result in previously approved projects losing support, funding being redirected, or strategic direction changing midstream. This undermines continuity, long-term planning, and accountability. Overall, the rationale points to the need for stronger governance, improved planning and feasibility processes, enhanced contractor management, and greater policy stability. Addressing these issues holistically is essential to reducing project abandonment and ensuring the sustainable delivery of public infrastructure. Overall, the article concludes by admitting that there are several causes for the abandonment of public infrastructure projects in the three selected local municipalities. In summary, this article argues that some of the causes, such as community protests, underquoting by contractors, political interference in the appointment of project labourers, lack of enough project capital by contractors and subcontracting issues, that lead to the abandonment of construction of public infrastructure projects can be dealt with. In short, none of the three selected local municipalities was able to complete their infrastructure projects without experiencing challenges.</p>
<p>The findings of the study lead to the following recommendations: Rigorous vetting of service providers, municipalities should do business with contractors who have the capacity for delivering road, water and sport infrastructure projects. Also, the budgeting unit in the municipality should work closely with contractors and project management personnel to ensure that the money allocated for projects is realistic and sufficient. This is because one of the respondents argued that there is no adequate communication between the finance (budget) and project management units in the municipalities. The current misalignment between project planning and financial planning must be systematically addressed to ensure full integration between technical project priorities and available budget allocations. Strengthening this alignment will improve the credibility of municipal infrastructure plans, enable more efficient resource utilisation, reduce delays caused by funding gaps, and support the sustainable and timely delivery of infrastructure projects that meet community needs. There is also a need for consequence management for political interference during awards of contracts and tightened policies which will not allow politicians to interfere with the work of SCM when awarding contracts.</p>
<p>The present findings confirm that there are a number of factors that contribute to the abandonment of public infrastructure projects. Future studies should be carried out elsewhere in other municipalities to confirm whether other municipalities could share the same views about the causes for abandoning the construction of road, water and sport infrastructure projects. Future research should further confirm these findings by developing similar research questions and collecting data from respondents who work under the project management unit in the local government sphere. Finally, the findings may lead to the following implications: Underperforming contractors will have to be blacklisted, and this will prevent them from doing business with local municipalities anywhere in South Africa. Local municipalities may be required to review the criteria used to award contracts. This may also have implications for SCM policies. Additional implications may be that local municipalities will have to reconsider the way in which they appoint community members during the implementation of municipal infrastructure projects. For example, there is a need for transparency, fairness and accountability when appointing them. Therefore, this may have implications for the recruitment processes followed by local municipalities.</p>
</sec>
</body>
<back>
<ack>
<title>Acknowledgements</title>
<p>This article is based on research originally conducted as part of Selaelo J. Mabeba&#x2019;s doctoral thesis titled &#x2018;Towards A Model for Implementation of Public Infrastructure Projects in Selected Local Municipalities in Limpopo Province&#x2019;, submitted to the Faculty of Humanities in the School of Government Studies, North-West University in 2025. The thesis was supervised by Muhiya T. Lukamba and Thekiso Molokwane. The manuscript has since been revised and adapted for journal publication. The original thesis is currently unpublished and was not publicly available online at the time of publishing this article.</p>
<sec id="s20025" sec-type="COI-statement">
<title>Competing interests</title>
<p>The authors declare that they have no financial or personal relationships that may have inappropriately influenced them in writing this article.</p>
</sec>
<sec id="s20026">
<title>CRediT authorship contribution</title>
<p>Selaelo J. Mabeba: Writing &#x2013; original draft. Muhiya T. Lukamba: Writing &#x2013; review &#x0026; editing. Thekiso Molokwane: Conceptualisation, Methodology. All authors reviewed the article, contributed to the discussion of results, approved the final version for submission and publication, and take responsibility for the integrity of its findings.</p>
</sec>
<sec id="s20027">
<title>Ethical considerations</title>
<p>Ethical clearance to conduct this study was obtained from the North-West University Basic and Social Sciences Research Ethics Committee (No. NWU-01043-23-A7).</p>
</sec>
<sec id="s20028" sec-type="data-availability">
<title>Data availability</title>
<p>The data that support the findings of this study are not openly available and are available from the corresponding author, Selaelo J. Mabeba, upon reasonable request.</p>
</sec>
<sec id="s20029">
<title>Disclaimer</title>
<p>The views and opinions expressed in this article are those of the authors and are the product of professional research. They do not necessarily reflect the official policy or position of any affiliated institution, funder, agency, or that of the publisher. The authors are responsible for this article&#x2019;s results, findings, and content.</p>
</sec>
</ack>
<ref-list id="references">
<title>References</title>
<ref id="CIT0001"><mixed-citation publication-type="book"><person-group person-group-type="author"><string-name><surname>Accram</surname>, <given-names>A</given-names></string-name></person-group>., <year>2020</year>, <source><italic>Number of corruption cases in SA increase to 1995</italic></source>, <publisher-name>Corruption Watch</publisher-name>, <publisher-loc>Johannesburg</publisher-loc>, <comment>viewed 18 July 2026, from <ext-link ext-link-type="uri" xlink:href="https://www.corruptionwatch.org.za/wp-content/uploads/2020/09/7570J_CW_Report_A4_FINAL.pdf">https://www.corruptionwatch.org.za/wp-content/uploads/2020/09/7570J_CW_Report_A4_FINAL.pdf</ext-link>.</comment></mixed-citation></ref>
<ref id="CIT0002"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Ahsan</surname>, <given-names>K</given-names></string-name>. &#x0026; <string-name><surname>Gunawan</surname>, <given-names>I</given-names></string-name></person-group>., <year>2010</year>, &#x2018;<article-title>Analysis of cost and schedule performance of international development projects</article-title>&#x2019;, <source><italic>International Journal of Project Management</italic></source> <volume>28</volume>(<issue>1</issue>), <fpage>68</fpage>&#x2013;<lpage>78</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.ijproman.2009.03.005">https://doi.org/10.1016/j.ijproman.2009.03.005</ext-link></comment></mixed-citation></ref>
<ref id="CIT0003"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Aibinu</surname>, <given-names>A.A</given-names></string-name>. &#x0026; <string-name><surname>Jagboro</surname>, <given-names>G.O</given-names></string-name></person-group>., <year>2002</year>, &#x2018;<article-title>The effects of construction delays on project delivery in Nigerian construction industry</article-title>&#x2019;, <source><italic>International Journal of Project Management</italic></source> <volume>20</volume>(<issue>8</issue>), <fpage>593</fpage>&#x2013;<lpage>599</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/S0263-7863(02)00028-5">https://doi.org/10.1016/S0263-7863(02)00028-5</ext-link></comment></mixed-citation></ref>
<ref id="CIT0004"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Alinaitwe</surname>, <given-names>H</given-names></string-name>., <string-name><surname>Apolot</surname>, <given-names>R</given-names></string-name>. &#x0026; <string-name><surname>Tindiwensi</surname>, <given-names>D</given-names></string-name></person-group>., <year>2013</year>, &#x2018;<article-title>Investigation into the causes of delays and cost overruns in Uganda&#x2019;s public sector construction projects</article-title>&#x2019;, <source><italic>Journal of Construction in Developing Countries</italic></source> <volume>18</volume>(<issue>2</issue>), <fpage>33</fpage>&#x2013;<lpage>47</lpage>.</mixed-citation></ref>
<ref id="CIT0005"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Amoatey</surname>, <given-names>C.T</given-names></string-name>. &#x0026; <string-name><surname>Ankrah</surname>, <given-names>A.N.O</given-names></string-name></person-group>., <year>2017</year>, &#x2018;<article-title>Exploring critical road project delay factors in Ghana</article-title>&#x2019;, <source><italic>Journal of Facilities Managemen</italic></source> <volume>15</volume>(<issue>2</issue>), <fpage>110</fpage>&#x2013;<lpage>127</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1108/JFM-09-2016-0036">https://doi.org/10.1108/JFM-09-2016-0036</ext-link></comment></mixed-citation></ref>
<ref id="CIT0006"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Asha</surname>, <given-names>A.A</given-names></string-name>. &#x0026; <string-name><surname>Makalela</surname>, <given-names>K.I</given-names></string-name></person-group>., <year>2020</year>, &#x2018;<article-title>Challenges in the implementation of integrated development plan and service delivery in Lepelle-Nkumphi Municipality, Limpopo Province</article-title>&#x2019;, <source><italic>International Journal of Economics and Finance Studies</italic></source> <volume>12</volume>(<issue>1</issue>), <fpage>1</fpage>&#x2013;<lpage>15</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.34109/ijefs.202012101">https://doi.org/10.34109/ijefs.202012101</ext-link></comment></mixed-citation></ref>
<ref id="CIT0007"><mixed-citation publication-type="book"><person-group person-group-type="author"><collab>Association for Project Management Group (APMG)</collab></person-group>, <year>2017</year>, <source><italic>Managing benefits</italic></source>, <publisher-name>APMG International</publisher-name>, <publisher-loc>London</publisher-loc>.</mixed-citation></ref>
<ref id="CIT0008"><mixed-citation publication-type="web"><person-group person-group-type="author"><string-name><surname>Bhattacharya</surname>, <given-names>A</given-names></string-name>., <string-name><surname>Oppenheim</surname>, <given-names>J</given-names></string-name>. &#x0026; <string-name><surname>Stern</surname>, <given-names>N</given-names></string-name></person-group>., <year>2015</year>, &#x2018;<article-title>Driving sustainable development through better infrastructure: Key elements of a transformation program</article-title>&#x2019;, <comment>Global Economy &#x0026; Development Working Paper 91, viewed 15 November 2025, from <ext-link ext-link-type="uri" xlink:href="https://www.brookings.edu/wp-content/uploads/2016/07/07-sustainable-development-infrastructure-v2.pdf">https://www.brookings.edu/wp-content/uploads/2016/07/07-sustainable-development-infrastructure-v2.pdf</ext-link>.</comment></mixed-citation></ref>
<ref id="CIT0009"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Chan</surname>, <given-names>D.W</given-names></string-name>. &#x0026; <string-name><surname>Kumaraswamy</surname>, <given-names>M.M</given-names></string-name></person-group>., <year>1997</year>, &#x2018;<article-title>A comparative study of causes of time construction in Malaysia</article-title>&#x2019;, <source><italic>Journal of Cleaner Production</italic></source> <volume>204</volume>, <fpage>564</fpage>&#x2013;<lpage>572</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/S0263-7863(96)00039-7">https://doi.org/10.1016/S0263-7863(96)00039-7</ext-link></comment></mixed-citation></ref>
<ref id="CIT0010"><mixed-citation publication-type="book"><person-group person-group-type="author"><string-name><surname>Creswell</surname>, <given-names>J.W</given-names></string-name></person-group>., <year>2014</year>, Research design: <source><italic>Qualitative, quantitative, and mixed methods approaches</italic></source>, <edition>4th edn.</edition>, <publisher-name>SAGE Publications</publisher-name>, <publisher-loc>Thousand Oaks, CA</publisher-loc>.</mixed-citation></ref>
<ref id="CIT0011"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Damoah</surname>, <given-names>I.S</given-names></string-name>. &#x0026; <string-name><surname>Akwei</surname>, <given-names>C</given-names></string-name></person-group>., <year>2021</year>, &#x2018;<article-title>The politics of project abandonment in developing countries: The case of Ghana</article-title>&#x2019;, <source><italic>International Journal of Project Management</italic></source> <volume>39</volume>(<issue>3</issue>), <fpage>197</fpage>&#x2013;<lpage>209</lpage>.</mixed-citation></ref>
<ref id="CIT0012"><mixed-citation publication-type="book"><person-group person-group-type="author"><string-name><surname>Dobbs</surname>, <given-names>R</given-names></string-name>., <string-name><surname>Pohl</surname>, <given-names>H</given-names></string-name>., <string-name><surname>Lin</surname>, <given-names>D.Y</given-names></string-name>., <string-name><surname>Mischke</surname>, <given-names>J</given-names></string-name>., <string-name><surname>Garemo</surname>, <given-names>N</given-names></string-name>., <string-name><surname>Hexter</surname>, <given-names>J</given-names></string-name>. <etal>et al</etal></person-group>., <year>2013</year>, <source><italic>Infrastructure productivity: How to save $1 trillion a year</italic></source>, <publisher-name>McKinsey Global Institute</publisher-name>, <publisher-loc>New York, NY</publisher-loc>.</mixed-citation></ref>
<ref id="CIT0013"><mixed-citation publication-type="book"><person-group person-group-type="author"><string-name><surname>Durdyev</surname>, <given-names>S</given-names></string-name>. &#x0026; <string-name><surname>Ihtiyar</surname>, <given-names>A</given-names></string-name></person-group>., <year>2019</year>, &#x2018;<chapter-title>Attitudes of cambodian homebuyers towards the factors influencing their intention to purchase green building</chapter-title>&#x2019;, in <person-group person-group-type="editor"><string-name><given-names>Z.</given-names> <surname>Gou</surname></string-name> (ed.)</person-group>, <source><italic>Green building in developing countries: Policy, strategy and technology</italic></source>, pp. <fpage>147</fpage>&#x2013;<lpage>160</lpage>, <publisher-name>Springer</publisher-name>, <publisher-loc>Amsterdam</publisher-loc>.</mixed-citation></ref>
<ref id="CIT0014"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Durdyev</surname>, <given-names>S</given-names></string-name>., <string-name><surname>Ismail</surname>, <given-names>S</given-names></string-name>., <string-name><surname>Ihtiyar</surname>, <given-names>A</given-names></string-name>., <string-name><surname>Bakar</surname>, <given-names>N.F.S.A</given-names></string-name>. &#x0026; <string-name><surname>Darko</surname>, <given-names>A</given-names></string-name></person-group>., <year>2018</year>, &#x2018;<article-title>A partial least squares structural equation modeling (PLS-SEM) of barriers to sustainable construction in Malaysia</article-title>&#x2019;, <source><italic>Journal of Cleaner Production</italic></source> <volume>204</volume>, <fpage>564</fpage>&#x2013;<lpage>572</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.jclepro.2018.08.304">https://doi.org/10.1016/j.jclepro.2018.08.304</ext-link></comment></mixed-citation></ref>
<ref id="CIT0015"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Edelenbos</surname>, <given-names>J</given-names></string-name>. &#x0026; <string-name><surname>Teisman</surname>, <given-names>G.R</given-names></string-name></person-group>., <year>2008</year>, &#x2018;<article-title>Public-private partnership: On the edge of project and process management. Insights from Dutch practice: The Sijtwende spatial development project</article-title>&#x2019;, <source><italic>Environment and Planning C: Politics and Space</italic></source> <volume>26</volume>(<issue>3</issue>), <fpage>614</fpage>&#x2013;<lpage>626</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1068/c66m">https://doi.org/10.1068/c66m</ext-link></comment></mixed-citation></ref>
<ref id="CIT0016"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Faku</surname>, <given-names>S.M</given-names></string-name>. &#x0026; <string-name><surname>Lukman</surname>, <given-names>Y</given-names></string-name></person-group>., <year>2025</year>, &#x2018;<article-title>Exploring infrastructure project delays in a selected Eastern Cape Municipality, South Africa</article-title>&#x2019;, <source><italic>Journal of Local Government Research and Innovation</italic></source> <volume>6</volume>, <fpage>a235</fpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.4102/jolgri.v6i0.235">https://doi.org/10.4102/jolgri.v6i0.235</ext-link></comment></mixed-citation></ref>
<ref id="CIT0017"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Ferk</surname>, <given-names>B</given-names></string-name>., <string-name><surname>Podhraski</surname>, <given-names>D</given-names></string-name>. &#x0026; <string-name><surname>Ferk</surname>, <given-names>P</given-names></string-name></person-group>., <year>2020</year>, &#x2018;<article-title>ICF evaluation methodology of the most economically advantageous tender (MEAT)</article-title>&#x2019;, <source><italic>SSRN</italic></source>, pp. <fpage>1</fpage>&#x2013;<lpage>27</lpage>.</mixed-citation></ref>
<ref id="CIT0018"><mixed-citation publication-type="journal"><person-group person-group-type="author"><collab>Global Initiative Against Transnational Organised Crime</collab></person-group>, <year>2022</year>, <source><italic>Strategic organised crime risk assessment: South Africa</italic></source>, <comment>viewed 22 January 2025, from <ext-link ext-link-type="uri" xlink:href="https://globalinitiative.net/wp-content/uploads/2022/09/GI-TOC-Strategic-Organized-Crime-Risk-Assessment-South-Africa.pdf">https://globalinitiative.net/wp-content/uploads/2022/09/GI-TOC-Strategic-Organized-Crime-Risk-Assessment-South-Africa.pdf</ext-link>.</comment></mixed-citation></ref>
<ref id="CIT0019"><mixed-citation publication-type="book"><person-group person-group-type="author"><string-name><surname>Hollands</surname>, <given-names>G</given-names></string-name></person-group>., <year>2019</year>, <source><italic>Corruption in infrastructure delivery: South Africa</italic></source>, <publisher-name>Loughborough University</publisher-name>, <publisher-loc>England</publisher-loc>.</mixed-citation></ref>
<ref id="CIT0020"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Ibrahim</surname>, <given-names>I</given-names></string-name></person-group>., <year>2025</year>, &#x2018;<article-title>Understanding the causes and consequences of abandoned government projects: Insights from community perspectives</article-title>&#x2019;, <source><italic>Journal of Humanities and Social Policy</italic></source> <volume>11</volume>(<issue>3</issue>), <fpage>137</fpage>&#x2013;<lpage>154</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.56201/jhsp.vol.11.no3.2025.pg137.154">https://doi.org/10.56201/jhsp.vol.11.no3.2025.pg137.154</ext-link></comment></mixed-citation></ref>
<ref id="CIT0021"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Ika</surname>, <given-names>L.A</given-names></string-name></person-group>., <year>2012</year>, &#x2018;<article-title>Project management for development in Africa: Why projects are failing and what can be done about it</article-title>&#x2019;, <source><italic>Project Management Journal</italic></source> <volume>43</volume>(<issue>4</issue>), <fpage>27</fpage>&#x2013;<lpage>41</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1002/pmj.21281">https://doi.org/10.1002/pmj.21281</ext-link></comment></mixed-citation></ref>
<ref id="CIT0022"><mixed-citation publication-type="book"><person-group person-group-type="author"><collab>Inclusive Society Institute</collab></person-group>, <year>2023</year>, <source><italic>Realising the constitutional goals through a transformed and people-driven state</italic></source>, <comment>Occasional Paper 1/2023</comment>, <publisher-name>Inclusive Society Institute</publisher-name>, <publisher-loc>Cape Town</publisher-loc>.</mixed-citation></ref>
<ref id="CIT0023"><mixed-citation publication-type="book"><person-group person-group-type="author"><collab>International Federation of Accountants (IFAC)</collab></person-group>, <year>2013</year>, <source><italic>Good governance in the public sector: Consultation draft for an international framework</italic></source>, <publisher-name>International Federation of Accountants</publisher-name>, <publisher-loc>New York, NY</publisher-loc>.</mixed-citation></ref>
<ref id="CIT0024"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Jacobs</surname>, <given-names>J</given-names></string-name>., <string-name><surname>Aigbavboa</surname>, <given-names>C</given-names></string-name>., <string-name><surname>Thwala</surname>, <given-names>W</given-names></string-name>. &#x0026; <string-name><surname>Dithebe</surname>, <given-names>K</given-names></string-name></person-group>., <year>2021</year>, &#x2018;<article-title>Factors affecting sustainable infrastructure delivery in South Africa &#x2013; A case of Gauteng province</article-title>&#x2019;, <source><italic>IOP Conference Series: Materials Science and Engineering</italic></source> <volume>1036</volume>, <fpage>012058</fpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1088/1757-899X/1036/1/012058">https://doi.org/10.1088/1757-899X/1036/1/012058</ext-link></comment></mixed-citation></ref>
<ref id="CIT0025"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Javed</surname>, <given-names>A.A</given-names></string-name>., <string-name><surname>Lam</surname>, <given-names>T.I</given-names></string-name>. &#x0026; <string-name><surname>Zou</surname>, <given-names>P.X.W</given-names></string-name></person-group>., <year>2013</year>, &#x2018;<article-title>Output-based specifications for PPP projects: Lessons for facilities management from Australia</article-title>&#x2019;, <source><italic>Journal of Facilities Management</italic></source> <volume>11</volume>(<issue>1</issue>), <fpage>5</fpage>&#x2013;<lpage>30</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1108/14725961311301448">https://doi.org/10.1108/14725961311301448</ext-link></comment></mixed-citation></ref>
<ref id="CIT0026"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Maritz</surname>, <given-names>M</given-names></string-name>. &#x0026; <string-name><surname>Hattingh</surname>, <given-names>V</given-names></string-name></person-group>., <year>2015</year>, &#x2018;<article-title>Adjudication in South African construction industry practice: Towards legislative intervention</article-title>&#x2019;, <source><italic>Journal of the South African Institution of Civil Engineering</italic></source> <volume>57</volume>(<issue>2</issue>), <fpage>45</fpage>&#x2013;<lpage>49</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.17159/2309-8775/2015/v57n2a6">https://doi.org/10.17159/2309-8775/2015/v57n2a6</ext-link></comment></mixed-citation></ref>
<ref id="CIT0027"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Mazele</surname>, <given-names>O</given-names></string-name>. &#x0026; <string-name><surname>Amoah</surname>, <given-names>C</given-names></string-name></person-group>., <year>2022</year>, &#x2018;<article-title>The causes of poor infrastructure management and maintenance in South African municipalities</article-title>&#x2019;, <source><italic>Property Management</italic></source> <volume>40</volume>(<issue>2</issue>), <fpage>192</fpage>&#x2013;<lpage>206</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1108/PM-06-2021-0042">https://doi.org/10.1108/PM-06-2021-0042</ext-link></comment></mixed-citation></ref>
<ref id="CIT0028"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Mfebe</surname>, <given-names>W</given-names></string-name></person-group>., <year>2019</year>, <source><italic>Construction industry up in flames: Urgent action required</italic></source>, <comment>viewed 15 November 2025, from <ext-link ext-link-type="uri" xlink:href="https://cdn.ymaws.com/www.safcec.org.za/resource/resmgr/press_releases/SAFCEC_Letter_to_Minister_of.pdf">https://cdn.ymaws.com/www.safcec.org.za/resource/resmgr/press_releases/SAFCEC_Letter_to_Minister_of.pdf</ext-link>.</comment></mixed-citation></ref>
<ref id="CIT0029"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Mlambo</surname>, <given-names>V.H</given-names></string-name>., <string-name><surname>Zubane</surname>, <given-names>S.P</given-names></string-name>. &#x0026; <string-name><surname>Thusi</surname>, <given-names>X</given-names></string-name></person-group>., <year>2022</year>, &#x2018;<article-title>Interrogating governance challenges and cadre deployment in South Africa</article-title>&#x2019;, <source><italic>Cihan University-Erbil Journal of Humanities and Social Sciences</italic></source> <volume>6</volume>(<issue>1</issue>), <fpage>11</fpage>&#x2013;<lpage>18</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.24086/cuejhss.v6n1y2022.pp11-18">https://doi.org/10.24086/cuejhss.v6n1y2022.pp11-18</ext-link></comment></mixed-citation></ref>
<ref id="CIT0030"><mixed-citation publication-type="book"><person-group person-group-type="author"><string-name><surname>Mntu</surname>, <given-names>A</given-names></string-name>., <string-name><surname>Kajimo-Shakantu</surname>, <given-names>K</given-names></string-name>. &#x0026; <string-name><surname>Mogorosi</surname>, <given-names>T</given-names></string-name></person-group>., <year>2024</year>, &#x2018;<chapter-title>Factors affecting public sector infrastructure delivery in the Eastern Cape, South Africa</chapter-title>&#x2019;, in <person-group person-group-type="editor"><string-name><given-names>I.</given-names> <surname>Musonda</surname></string-name>, <string-name><given-names>E.</given-names> <surname>Mwanaumo</surname></string-name>, <string-name><given-names>A.</given-names> <surname>Onososen</surname></string-name> &#x0026; <string-name><given-names>T.</given-names> <surname>Moyo</surname></string-name> (eds.)</person-group>, <source><italic>Smart and resilient infrastructure for emerging economies: Perspectives on building better</italic></source>, pp. <fpage>134</fpage>&#x2013;<lpage>142</lpage>, <publisher-name>CRC Press</publisher-name>, <publisher-loc>Boca Raton</publisher-loc>.</mixed-citation></ref>
<ref id="CIT0031"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Msimango</surname>, <given-names>N</given-names></string-name>., <string-name><surname>Orffer</surname>, <given-names>C</given-names></string-name>. &#x0026; <string-name><surname>Van Reenen</surname>, <given-names>N</given-names></string-name></person-group>., <year>2024</year>, &#x2018;<article-title>Impact of targeted infrastructure investment on economic growth and employment in South Africa</article-title>&#x2019;, <source><italic>African Journal of Infrastructure Development (DAJID)</italic></source> <volume>1</volume>(<issue>1</issue>), <fpage>22</fpage>&#x2013;<lpage>49</lpage>.</mixed-citation></ref>
<ref id="CIT0032"><mixed-citation publication-type="thesis"><person-group person-group-type="author"><string-name><surname>Ndlovu</surname>, <given-names>M</given-names></string-name></person-group>., <year>2020</year>, &#x2018;<article-title>Factors affecting time and cost overruns in road construction projects in a metropolitan municipality of the Free State province</article-title>&#x2019;, <comment>Masters dissertation</comment>, <publisher-name>University of Free State</publisher-name>.</mixed-citation></ref>
<ref id="CIT0033"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Nel</surname>, <given-names>V</given-names></string-name>. &#x0026; <string-name><surname>Minnie</surname>, <given-names>S</given-names></string-name></person-group>., <year>2022</year>, &#x2018;<article-title>Can the district development model deliver development in South African local governments?</article-title>&#x2019;, <source><italic>Rozw&#x00F3;j Regionalny i Polityka Regionalna</italic></source> <volume>60</volume>(<issue>Special Issue</issue>), <fpage>39</fpage>&#x2013;<lpage>53</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.14746/rrpr.2022.60s.05">https://doi.org/10.14746/rrpr.2022.60s.05</ext-link></comment></mixed-citation></ref>
<ref id="CIT0034"><mixed-citation publication-type="journal"><person-group person-group-type="author"><collab>Programme for Infrastructure Development in Africa (PIDA)</collab></person-group>, <year>2010</year>, <source><italic>Interconnecting, integrating and transforming a continent</italic></source>, <comment>viewed October 2025, from <ext-link ext-link-type="uri" xlink:href="https://www.afdb.org/fileadmin/uploads/afdb/Documents/Project-and-Operations/PIDA&#x0025;20note&#x0025;20English&#x0025;20for&#x0025;20web&#x0025;200208.pdf">https://www.afdb.org/fileadmin/uploads/afdb/Documents/Project-and-Operations/PIDA&#x0025;20note&#x0025;20English&#x0025;20for&#x0025;20web&#x0025;200208.pdf</ext-link></comment></mixed-citation></ref>
<ref id="CIT0035"><mixed-citation publication-type="book"><person-group person-group-type="author"><collab>Republic of South Africa</collab></person-group>, <year>2000</year>, <source><italic>Preferential procurement policy framework Act 5 of 2000</italic></source>, <publisher-name>Government Printer</publisher-name>, <publisher-loc>Pretoria</publisher-loc>.</mixed-citation></ref>
<ref id="CIT0036"><mixed-citation publication-type="book"><person-group person-group-type="author"><collab>Republic of South Africa</collab></person-group>, <year>2003</year>, <source><italic>Municipal finance management Act 56 of 2003</italic></source>, <publisher-name>Government Printer</publisher-name>, <publisher-loc>Pretoria</publisher-loc>.</mixed-citation></ref>
<ref id="CIT0037"><mixed-citation publication-type="book"><person-group person-group-type="author"><collab>Republic of South Africa</collab></person-group>, <year>2005</year>, <source><italic>National treasury supply chain management regulations</italic></source>, <publisher-name>Government Printer</publisher-name>, <publisher-loc>Pretoria</publisher-loc>.</mixed-citation></ref>
<ref id="CIT0038"><mixed-citation publication-type="book"><person-group person-group-type="author"><string-name><surname>Schutt</surname>, <given-names>R.K</given-names></string-name></person-group>., <year>2011</year>, <source><italic>Qualitative data analysis. Investigating the social world: The process and practice of research</italic></source>, <edition>7th edn.</edition>, pp. <fpage>320</fpage>&#x2013;<lpage>357</lpage>, <publisher-name>Sage Publications</publisher-name>, <publisher-loc>Thousand Oaks, California (CA), USA</publisher-loc>.</mixed-citation></ref>
<ref id="CIT0039"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Shankman</surname>, <given-names>N.A</given-names></string-name></person-group>., <year>1999</year>, &#x2018;<article-title>Reframing the debate between agency and stakeholder theories of the firm</article-title>&#x2019;, <source><italic>Journal of Business Ethics</italic></source> <volume>19</volume>(<issue>4</issue>), <fpage>319</fpage>&#x2013;<lpage>333</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1023/A:1005880031427">https://doi.org/10.1023/A:1005880031427</ext-link></comment></mixed-citation></ref>
<ref id="CIT0040"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Signor</surname>, <given-names>R</given-names></string-name>., <string-name><surname>Love</surname>, <given-names>P.E.D</given-names></string-name>., <string-name><surname>Belarmino</surname>, <given-names>A.T.N</given-names></string-name>. &#x0026; <string-name><surname>Olatunji</surname>, <given-names>O.A</given-names></string-name></person-group>., <year>2020</year>, &#x2018;<article-title>Detection of collusive tenders in infrastructure projects: Learning from operation car wash</article-title>&#x2019;, <source><italic>Journal of Construction Engineering and Management</italic></source> <volume>146</volume>(<issue>1</issue>), <fpage>05019015</fpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1061/(ASCE)CO.1943-7862.0001737">https://doi.org/10.1061/(ASCE)CO.1943-7862.0001737</ext-link></comment></mixed-citation></ref>
<ref id="CIT0041"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Srinivasu</surname>, <given-names>B</given-names></string-name>. &#x0026; <string-name><surname>Rao</surname>, <given-names>P.S</given-names></string-name></person-group>., <year>2013</year>, &#x2018;<article-title>Infrastructure development and economic growth: Prospects and perspective</article-title>&#x2019;, <source><italic>Journal of Business Management and Social Sciences Research</italic></source> <volume>2</volume>(<issue>1</issue>), <fpage>81</fpage>&#x2013;<lpage>91</lpage>.</mixed-citation></ref>
<ref id="CIT0042"><mixed-citation publication-type="book"><person-group person-group-type="author"><collab>The Economics Intelligence Unit</collab></person-group>, <year>2019</year>, <source><italic>The critical role of infrastructure for sustainable development goals</italic></source>, <publisher-name>United Nations Office for Project Services</publisher-name>, <comment>viewed 13 August 2024, from <ext-link ext-link-type="uri" xlink:href="https://content.unops.org/publications/The-critical-roleof-infrastructure-for-the-SDGs_EN">https://content.unops.org/publications/The-critical-roleof-infrastructure-for-the-SDGs_EN</ext-link>.</comment></mixed-citation></ref>
<ref id="CIT0043"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Torrisi</surname>, <given-names>G</given-names></string-name></person-group>., <year>2009</year>, &#x2018;<article-title>Public infrastructure: Definition, classification and measurement issues</article-title>&#x2019;, <source><italic>Economics, Management and Financial Markets</italic></source> <volume>4</volume>(<issue>3</issue>), <fpage>100</fpage>&#x2013;<lpage>124</lpage>.</mixed-citation></ref>
<ref id="CIT0044"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Ullah</surname>, <given-names>K</given-names></string-name>., <string-name><surname>Abdullah</surname>, <given-names>A.H</given-names></string-name>., <string-name><surname>Nagapan</surname>, <given-names>S</given-names></string-name>., <string-name><surname>Sohoo</surname>, <given-names>S</given-names></string-name>. &#x0026; <string-name><surname>Khan</surname>, <given-names>M.S</given-names></string-name></person-group>., <year>2017</year>, &#x2018;<article-title>Theoretical framework of the causes of construction time and cost overruns</article-title>&#x2019;, <source><italic>IOP Conference Series: Materials Science and Engineering</italic></source> <volume>271</volume>(<issue>1</issue>), <fpage>012032</fpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1088/1757-899X/271/1/012032">https://doi.org/10.1088/1757-899X/271/1/012032</ext-link></comment></mixed-citation></ref>
<ref id="CIT0045"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Van den Hurk</surname>, <given-names>M</given-names></string-name>. &#x0026; <string-name><surname>Verhoest</surname>, <given-names>K</given-names></string-name></person-group>., <year>2016</year>, &#x2018;<article-title>The challenge of using standard contracts in public&#x2013;private partnerships</article-title>&#x2019;, <source><italic>Public Management Review</italic></source> <volume>18</volume>(<issue>2</issue>), <fpage>278</fpage>&#x2013;<lpage>299</lpage>. <comment><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1080/14719037.2014.984623">https://doi.org/10.1080/14719037.2014.984623</ext-link></comment></mixed-citation></ref>
<ref id="CIT0046"><mixed-citation publication-type="book"><person-group person-group-type="author"><string-name><surname>Williman</surname>, <given-names>N</given-names></string-name></person-group>., <year>2011</year>, <source><italic>Research methods: The basics</italic></source>, <publisher-name>Routledge, Taylor &#x0026; Francise-Library</publisher-name>, <publisher-loc>London</publisher-loc>.</mixed-citation></ref>
</ref-list>
<fn-group>
<fn><p><bold>How to cite this article:</bold> Mabeba, S.J., Lukamba, M.T. &#x0026; Molokwane, T., 2026, &#x2018;Exploring factors leading to the abandonment of public infrastructure projects in selected local municipalities in Limpopo province&#x2019;, <italic>Journal of Local Government Research and Innovation</italic> 7(0), a338. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.4102/jolgri.v7i0.338">https://doi.org/10.4102/jolgri.v7i0.338</ext-link></p></fn>
</fn-group>
</back>
</article>